Cancel/ Change Order
At Briansw, we understand that plans can change. Whether you have had a change of heart regarding a style, need to update your shipping details, or selected the wrong handbag size, we are here to assist. However, because we strive for rapid fulfillment, there is a very limited window for modifications.
Quick Summary
-
Cancellation: Orders can only be canceled if they have not yet entered the shipping process (typically within 2-4 hours).
-
Changes: Address or item swaps can only be made before the order is packed and labeled.
-
Post-Shipment: Once a tracking number is generated, please refer to our Return & Refund Policy.
1. Handbag Processing Timeline
To ensure your luxury items reach you promptly, our warehouse team begins the inspection and packing process shortly after your order is placed:
-
Quality Control & Packing: Each handbag undergoes a final check for leather quality, stitching, and hardware before being secured in protective packaging (usually within 1-2 hours).
-
Label Creation: Once a shipping label is printed, the order is marked as "Shipped" and can no longer be modified or stopped.
2. How to Request a Change
Time is of the essence. Please follow these steps:
-
Act Immediately: Email us at support@briansw.com as soon as possible.
-
Provide Details: Include your Order Number (e.g., #BKD1234) and the specific change (e.g., "Change Tote to Crossbody" or "Update Shipping Address").
-
Subject Line: Use "URGENT: Order Change #Number" to help our team prioritize your request.
3. Specific Scenarios
-
Item/Color Swap: If the desired handbag is in stock and your order hasn't been boxed, we will happily swap it for you.
-
Shipping Address: We can update the destination if the package is still in our facility. If it has already left, any carrier redirection fees will be the customer's responsibility.
-
Adding Items: For security reasons, we cannot add items to an existing order. Please place a separate order for any additional accessories.
Contact Our Concierge Team
-
Email: support@briansw.com (Recommended for faster tracking)
-
Address: 10600 4th St N, Saint Petersburg, FL 33716, United States
-
Hours: Monday – Saturday | 8:00 AM – 7:00 PM (EST)